Gas line image

What is the power up sequence for e2v-Grenoble ADCs?

Post Date:
07/16/07 
Question:
What is the power up sequence for e2v-Grenoble ADCs?
Answer:
We recommend our ADC users to proceed as follows:

- First apply the VEE = –5V power supply;

- Then turn on VCC = +5V power supply;

- Finally, connect VPLUSD, if needed.

Note: This sequence is not critical. A different power up sequence will not damage the devices.