
Post Date: | 07/16/07 |
Question: | What is the power up sequence for e2v-Grenoble ADC + DMUX? |
Answer: | When using both e2v-Grenoble ADC and DMUX, the power up sequence for the devices is the following: - First apply the VEE = –5V power supply; - Second turn on VCC = +5V power supply; - Afterwards, connect VPLUSD, if needed; - VTT should be then supplied; - Thereafter, you can apply the clock and the analog inputs; - Finally, it is required to perform an asynchronous reset on the DMUX. Note: In this sequence, the last two steps are mandatory in this specified order. Nevertheless, the first 4 steps are not critical. |